Menu
  • News
  • Your Impact
  • Leadership
  • The Building
  • Donate
    • Give today!
    • Ways to Give
      • Individual
      • Support an Initiative
    • Meet the Team
Building the Future
  • News
  • Your Impact
  • Leadership
  • The Building
  • Donate
    • Give today!
    • Ways to Give
      • Individual
      • Support an Initiative
    • Meet the Team
  • Return to UTS School Website

Blog

Construction UpdatesImpact ConstructionMcIntyre Gym

Get ready for the epic UTS Athletics Centre: June 2021 Construction Update

By Kimberley FehrJuly 08, 2021Comments Disabled
McIntryre Gym

McIntryre Gym

Soon the sound of the buzzer will echo in our new McIntyre Gymnasium, with more space to learn and play at our school than ever before.

The Blues will score and the fans will roar, and UTS students will experience the fitness opportunities provided by the state-of-the-art UTS Athletics Centre in our renewed building, core to the transformative education at our school.

Work on our new building is getting down to the details now – those smaller but vital interior finishing touches that make a big difference for the life of our school. The window framing and glazing for the Fleck Atrium has been completed, including the skylight. Beside the McIntyre Gym, changerooms and shower facilities are taking shape with tile installation about to begin.

The Ridley Fitness Centre is also coming together. Inside, there will be a staff office that will have recognition for alumnus, teacher and coach Don Fawcett ’50, and a large open space where students will push the limits of their possibilities using everything from free weights to resistance bands, stationary bikes to training benches.

In the Library, wall partitions for study rooms and storage rooms have been erected and there are grooves in the concrete floor ready for the tracks that will soon support the moveable library stacks. It won’t be long now before students will be studying here.

In the heritage building, flooring is nearly complete on the third floor and now underway on the second level. The elevators are nearly done, ensuring the accessibility of our school for everyone.

Outside the Withrow Auditorium, on the Huron Street side of the building, workers are laying new bricks on the exterior wall adjacent to the space that will become the park.

Congratulations to Eastern Construction for celebrating the 70th anniversary of their company, a track record that speaks for itself! They are doing a wonderful job on our new building, and it won’t be long now before a student sinks a slam dunk in the McIntyre Gym, or makes that unstoppable volleyball serve. It’s going to be epic!

You can make sure that UTS students have all the athletic and fitness training equipment they need in time for their return to 371 Bloor this November.

Support the Build Avi’s Classroom initiative now >>

Go Blues! Imagine students playing volleyball here and the fans cheering –
there will be so much space to play in the new McIntyre Gymnasium.

BluesBuilding the FutureMcIntryre GymUTS Athletics
  • email
  • facebook
  • linkedin
  • twitter
  • google+
  • pinterest
UTS spirit will soar
Build Shuyu’s Gym

Related Posts

Miraculous feelings to come: UTS Head of Academics Marc Brims

Miraculous feelings to come: UTS Head of Academics Marc Brims

Impact Construction, Inspiration, McIntyre Gym

Miraculous feelings to come: UTS Head of Academics Marc Brims

As we prepare to return to our renewed historic home at 371 Bloor Street West, UTS...
May 2019: Meet Project Manager Miguel

May 2019: Meet Project Manager Miguel

Construction Updates

May 2019: Meet Project Manager Miguel

Work continues daily on the historic revitalization of UTS, with construction ongoing...

Recent Posts

  • Back to School is Better than Ever!
  • Making our new school feel like home: UTS Co-Captains Harry and Kat
  • A culture of greater inclusion: UTS Principal Rosemary Evans
  • A school for change: Lisa Freeman ’87, P ’27
  • What our work on inclusion could mean: Dr. Kimberley Tavares

371 Bloor St. WToronto, Ontario, M5S 2R7

btf@utschools.ca

416-978-3919

Donate Today
Comment Author Info